A forging unit in Faridabad has its Level 3 pack nearly ready. The ballooned drawing is done and the dimensional report is clean. Section 10 holds the steel supplier’s mill certificate and a hardness report from a lab down the road. The customer’s supplier quality engineer opens section 12 and finds it empty. Is that lab accredited for hardness testing, or only for chemical analysis? Was its hardness tester calibrated when the parts were tested? Nobody in the plant can answer from the file, so the pack goes back.

The short answer: Element 10, material and performance test results, is the evidence that every material and performance requirement on the drawing and the control plan was tested on production parts, with actual results against each specification. Element 12, qualified laboratory documentation, proves that the labs behind those results were qualified for those exact tests: a laboratory scope for an in-house lab, and a third-party accreditation certificate with its scope for an outside lab. Customers read the two sections together. A test result with no qualified lab behind it can be rejected.

What goes into element 10, material and performance test results?

PPAP is defined by AIAG, the Automotive Industry Action Group, whose PPAP manual is the industry standard for production part approval. Element 10 covers every test result other than dimensions. Customer manuals split it in two.

  • Material test results. Chemical, physical or metallurgical requirements named on the design record or control plan. Methode’s supplier requirements make them mandatory for all parts and product materials, plating included, whenever the drawing or control plan specifies such a requirement.
  • Performance test results. Functional and durability tests that the design record, control plan or customer asks for. TI Fluid Systems accepts a design validation performance report (DVPR) as the submission for this section.

TI’s guideline lists what each report must show: the change level of the parts tested, the number, date and change level of the specification tested against, the date of testing, the quantity actually tested, and the actual results with a pass or fail. It also asks for material and performance specifications to be numbered on the drawing the way dimensions are ballooned, so every test traces to a line on the print. If any data comes from a sub-supplier process such as external coating, TI wants that company’s name, address and contact recorded too.

Two points catch Indian plants most often. The first is the certificate type. Prestolite accepts a certificate of compliance but prefers a certificate of analysis that shows actual values, and Methode calls a general certificate of compliance unacceptable. The second is age. Methode wants complete test results current within nine months, and Tenneco says no data should be older than one year without first contacting its representative. The hub page on PPAP documentation questions lists all 18 elements and covers most of the rest briefly.

What we’ve learned preparing 50+ Level 3 PPAP reports: the report that causes the most trouble is the old one. A corrosion or hardness report from last year’s batch, re-dated to look current, is the quickest way to lose a reviewer’s trust in the whole pack. When a result is out of date under the customer’s rule, re-test on parts from the production run and file the new report with its own date.

What does element 12, qualified laboratory documentation, have to prove?

Element 12 answers one question: was the lab that produced each result qualified to produce it? The evidence differs for in-house and outside labs.

  • In-house lab. Prestolite’s handbook asks for a copy of the laboratory scope and documents showing the lab is qualified for the measurements or tests it ran, such as personnel competency and training records.
  • Outside lab. Prestolite asks for a copy of the lab’s third-party accreditation, with results on the lab’s letterhead naming the lab, the test date and the standards used. Tenneco asks for the certificate and the scope of accreditation, and says the lab must be ISO/IEC 17025 accredited or hold a regional equivalent.
  • Calibration. TI’s guideline, which ties this element to IATF 16949, the automotive quality management standard, goes further. Each submission should include calibration certificates for all inspection and test equipment used for PPAP data, the accreditation scope of each calibration body, and internal calibration data for anything the plant calibrates itself.

Notice what the calibration line does. A hardness value is only as good as the hardness tester, and the tester is only as good as the body that calibrated it. So element 12 is a chain: the lab’s own scope, the equipment it used, and the calibration body behind that equipment. A reviewer who wants to test the pack picks one result in section 10 and follows that chain back. If any link is missing, the result is in doubt, however good the number looks.

What is the difference between material and performance test results?

Both sit in element 10, and both trace to the drawing, but they answer different questions. Material results ask whether the part is made of what the drawing says. Performance results ask whether the part does what the drawing says.

  • Material results describe composition and properties. Typical entries are the chemistry of the steel or alloy grade on the drawing, mechanical properties, hardness, case depth, plating or coating thickness, and the material of a rubber or plastic part. Prestolite expects these as a material composition report, usually a certificate of analysis from an accredited lab.
  • Performance results describe behaviour. Typical entries are corrosion resistance, torque or load tests, leak tests, fatigue or durability cycles, and any validation test named in a referenced specification. Prestolite defines this as every test for a product, part or material where the design record, control plan or customer request specifies a performance or functional requirement.

Tenneco’s guidance puts product validation results in this section too, with weld cut and etch results as its example. The practical rule follows from all four manuals: if a requirement on the drawing or control plan is not a dimension and not an appearance item, its evidence probably belongs in section 10.

One more duty sits behind material results. Prestolite makes it the supplier’s job to plan ongoing material conformance testing and to show it as a separate line item in the control plan. A PPAP result proves the material once. The control plan line proves the plant will keep checking it after approval.

Why do customers reject sections 10 and 12?

Most rejections in these two sections are not about bad results. They are about evidence that cannot be trusted or traced. Read against the four customer manuals cited here, the common reasons are these.

  • A compliance statement with no values. Methode rejects a general certificate of compliance and wants test results included. Prestolite accepts one but prefers actual values.
  • Stale data. Methode’s nine-month window and Tenneco’s one-year limit both catch reports carried over from an earlier part or an earlier batch.
  • Revision mismatch. Tenneco checks that the part number and revision on every submitted document match the drawing. A report against the previous revision is a report on a different part.
  • No scope, or the wrong scope. An outside lab’s accreditation certificate without its scope, or a scope that does not list the test performed, leaves element 12 unproven.
  • Missing calibration evidence. TI asks for calibration certificates for every inspection and test instrument used for PPAP data, plus the calibration bodies’ scopes.
  • Unreadable reports. Methode requires reports to be legible and in English, or to carry English translations. A scanned report from a sub-supplier’s lab can fail on this alone.
  • Untraced sub-supplier data. TI wants the name, address and contact of any sub-supplier whose process produced the data, such as an outside plater or coater.

Every item on that list is a paperwork problem. None needs a new test if the plant catches it before submission, which is why the order of work matters.

Which body decides whether an Indian lab counts as accredited?

In India, the national accreditation body for testing and calibration labs is the National Accreditation Board for Testing and Calibration Laboratories, NABL, a constituent board of the Quality Council of India. NABL accredits testing and calibration labs to ISO/IEC 17025, and its website has a tool to verify a certificate and check the accredited scope. For a plant in Pune or Manesar sending samples to an outside lab, the usual element 12 evidence is that lab’s NABL certificate plus the scope page listing the exact test. A certificate alone is not enough. A lab accredited for spectro analysis of steel is not, by that certificate, accredited for a salt spray test.

The check takes a few minutes and is worth doing for every outside lab in the pack. Ask the lab for its certificate number, enter it in the verification tool on the NABL site, and read the scope that comes back. NABL says the scope can be checked by parameter, method and address, which covers the three things a reviewer will ask: does the scope list this test, by this method, at the lab address printed on the report? A lab with several branches may hold accreditation for a test at one address and not another. Save the scope page you checked with the date you checked it, and file it in section 12 next to the certificate.

The same check applies to calibration bodies. If an outside agency calibrated the hardness tester, the micrometers or the torque wrench used for PPAP data, its certificate and scope go into section 12 as well, because TI’s guideline asks for the scope of every calibration body that issued a certificate.

Your customer’s specific requirements still decide the details. Some customers name the accreditation they accept, and some add their own test or report formats. Read them before you book a lab, not after the report arrives.

How should a plant sequence elements 10 and 12?

The decision that saves a resubmission is to settle element 12 before any sample leaves the plant for element 10 testing. The order we use:

  1. List every non-dimensional requirement. Take each one from the drawing notes, referenced specifications and the control plan, and number it like a balloon.
  2. Match each test to a lab. Pull the accreditation certificate and scope, and confirm the scope names that test and the certificate is valid on the planned test date.
  3. Send production-run parts. Then check each report against the drawing: part number, revision, specification level, test date, quantity and actual values.
  4. Cross-reference both sections. Each report in section 10 points to the certificate, scope and calibration record in section 12 by its requirement number.
Requirement on the drawingElement 10 evidenceElement 12 evidence
Steel chemistryCertificate of analysis with actual values against the grade named on the drawingAccreditation certificate and scope listing chemical analysis of steel
Hardness after heat treatmentHardness report on production parts, with quantity and test dateLab scope or accreditation for hardness testing, plus the tester’s calibration certificate
Corrosion resistance of platingTest report with hours achieved against the specified requirementOutside lab’s accreditation certificate and scope naming that test
Coating done by a sub-supplierCoater’s results, with its name, address and contactThe coater’s or its test lab’s qualification documents

The timing decision follows from step 2. Book the lab when the control plan is frozen, and ask the lab for its scope before you ask for a quotation. If the nearest lab is not accredited for one of the tests, you find out while there is still time to send that sample elsewhere, before the production run and the submission date fix your calendar.

What should a section 12 file contain for a typical auto-component plant?

A section 12 file that a reviewer can check quickly is built as an index first, with documents behind it. For a machining or forging plant with a small in-house lab and one or two outside labs, the index usually runs like this.

  • In-house lab scope. The list of tests and measurements the plant’s own lab performs, with the methods it uses.
  • Competence records. Training or qualification records for the people who ran the PPAP tests, as Prestolite asks.
  • Equipment calibration. A certificate for each instrument used for PPAP data, the accreditation certificate and scope of the body that calibrated it, and internal calibration data for anything calibrated in-house.
  • Outside lab accreditation. For each outside lab, its accreditation certificate and the scope page that lists the test it ran, checked for validity on the test date.
  • Cross-reference sheet. One table linking each requirement number in section 10 to the lab, instrument and certificate that support it.

The cross-reference sheet is the part most packs leave out, and the part a reviewer uses most. It turns section 12 from a stack of certificates into an answer.

This is the work our PPAP documentation desk does from Gurugram. The plant keeps its tests, samples and measurements. We build the requirement list, check every certificate and scope against it, and assemble sections 10 and 12 so a reviewer can trace each result in one step.

A test result is only as good as the lab scope filed beside it.

People also ask

Is a steel mill certificate enough for element 10?

It depends on the customer’s manual and on what the drawing asks for. A mill certificate describes the bar as supplied, so requirements that apply to the finished part, such as hardness after heat treatment or plating, need tests on production parts. Some customers also reject a general certificate of compliance and want actual values.

Does an in-house lab need NABL accreditation for PPAP?

The customer manuals cited here ask an in-house lab for a documented laboratory scope, and Prestolite also wants evidence that its people are trained for the tests. Third-party accreditation is asked of outside labs. Calibration of the in-house equipment still has to trace to qualified calibration bodies. Check your customer’s specific requirements before relying on this.

At which submission levels are elements 10 and 12 required?

In the retention tables in the TI Fluid Systems and Prestolite manuals, both elements are retained at Level 1 and submitted at Levels 2 and 3. At Level 4 the customer decides, and at Level 5 the records are retained for review at the plant.

Want sections 10 and 12 cross-checked before your next submission?

Prove it on two live parts: a five-day pilot inside your existing quality process. No retainer, no software setup. Start a 2-part pilot →

Share