A machining supplier in Manesar is two weeks from its first IATF 16949 certification audit. The quality head has a shelf of PPAP binders, each with a signed warrant on top. The auditor opens the meeting with a different request: show me the process that decides how a part gets approved, who approves the bought-out parts first, and where the customer’s approval is recorded before you ship. The binders are the evidence. The auditor wants the rule that produced them. That gap is what this page covers.

The short answer: IATF 16949 does not use the word PPAP as its rule. It requires every certified supplier to establish, implement and maintain a product and manufacturing approval process that conforms to the customer’s requirements, to approve its own sub-supplier parts before submitting its part approval, and to obtain documented approval before shipment when the customer requires it. The standard then leaves the method to the customer, and many automotive customers, including GM and Ford, name the AIAG PPAP manual in their customer-specific requirements. So IATF 16949 makes an approval process mandatory, and your customer decides that the process is PPAP.

What does IATF 16949 require for product approval?

IATF 16949 is the automotive quality management standard a supplier is certified against. PPAP, the Production Part Approval Process, is the method a supplier uses to show that the customer’s design record and specification requirements are met consistently during an actual production run at production rates. The Automotive Industry Action Group (AIAG) publishes the PPAP manual as one of its Quality Core Tools, alongside APQP, FMEA, MSA, SPC and the control plan.

The product approval requirement sits in the design and development section of the standard. Read as a checklist, it asks for five things.

What the standard expectsWhat it means on the shop floorWhere the PPAP pack shows it
A product and manufacturing approval process that conforms to the customer’s requirementsA written procedure, owned by quality, that follows each customer’s approval methodThe procedure itself, plus one approved pack per part
Approval of externally provided products and services before your own submissionCastings, forgings, platings, heat treatment and bought-out parts are approved by you firstSub-tier warrants or a list of approved sub-tier PSWs
Documented product approval before shipment, if the customer requires itNo production quantities leave the gate until the customer signsThe customer-approved PSW or its portal equivalent
Records of those approvals keptApproved packs are retrievable for audits and later changesAn indexed, version-controlled pack
Approval that follows verification of the manufacturing processThe run on production tooling comes first, the paperwork afterCapability studies, MSA and dimensional results from that run

Notice what the standard leaves out. It sets no submission level, no list of elements and no warrant format. Those details come from the customer.

For a supplier with several customers, that means one procedure with a route per customer, not one procedure per customer. The procedure states the common steps once: read the requirements, approve the sub-tier, run, draft, sign, hold, file. It then points to each customer’s manual for the level, the forms and the portal. PSW, the Part Submission Warrant, is the one-page declaration that ties a pack together and carries the plant’s signature.

Is PPAP mandatory under IATF 16949?

Not by name. The standard makes a customer-conforming approval process mandatory. PPAP becomes mandatory the moment your customer’s requirements name it, and for many vehicle makers, including GM and Ford, they do.

  • General Motors. GM’s customer-specific requirements for IATF 16949, published on the IATF oversight site, tell suppliers to comply with the AIAG PPAP manual and GM’s own supplier quality requirements to meet the product approval clause. Read GM’s requirements.
  • Ford. Ford’s customer-specific requirements, effective February 2025, require compliance with the AIAG PPAP manual plus Ford’s Global Phased PPAP, and the AIAG Service PPAP manual for service parts. Read Ford’s requirements.
  • Other customers. Many OEMs and tier-ones in India run their own supplier quality manuals. Some use the AIAG format as it is, others add their own forms or portals. The manual in your purchase order decides.

Where a customer publishes no customer-specific requirements, look in the purchase order, the drawing notes and the supplier quality manual. If none of them names an approval method, ask the customer’s supplier quality engineer in writing and file the reply with the procedure. That reply is the evidence that your process conforms to what this customer wants.

Our PPAP documentation FAQ covers the 18 elements and the five submission levels in short answers. Level 3, the complete pack, is the usual default when the customer names no other level.

What we’ve learned preparing 50+ Level 3 PPAP reports: the pack moves fastest when the customer’s specific requirements are read before the first document is drafted, because they decide the manual, the level, the forms and the portal.

Which approval decisions does the standard force on a supplier?

The governing rules here come from IATF, AIAG and the customer, not from a government regulator. Together they fix the order of the work, and that order is the real design decision.

  1. Read the customer’s requirements first. The standard points to them, so every later choice depends on them: which PPAP edition, which level, which warrant format, which portal.
  2. Approve your sub-tier before you submit. Your caster’s or plater’s approval has to exist before your own warrant goes out. Ford, for example, accepts a summary of approved sub-tier warrants as evidence.
  3. Run the process, then write the pack. Approval follows verification of the manufacturing process, so capability, MSA and dimensional results must come from the production tooling, gauges and operators used for series supply.
  4. Hold shipment until approval, if required. For process changes, Ford requires PPAP approval before production quantities ship. Build that wait into the launch timeline, not the week before dispatch.
  5. Keep the records. An approved pack is evidence for the next audit and the starting point for the next change.
IATF 16949 makes an approval process mandatory; your customer decides that the process is PPAP.

Who owns each product approval step inside the plant?

Every step in the approval order needs one named owner, a trigger that starts it and an output that proves it happened. Product approval crosses quality, purchase, production and dispatch, and a step with no owner is the one that waits.

StepOwnerWhen it startsOutput to keep
Read the customer’s requirementsQuality head or the customer’s quality lead in the plantWhen the part is nominated or the enquiry arrivesA one-page summary of manual, edition, level, forms and portal
Approve sub-tier partsPurchase, with supplier qualityWhen sub-tier tooling is releasedSub-tier warrants or an approved list
Run on production toolingProduction, with qualityWhen tooling and gauges are provenCapability, MSA and dimensional results from that run
Draft the packQuality engineer, or an outside drafting teamWhen the run data existsBallooned print, process flow, PFMEA, control plan, PSW draft
Sign and submitThe plant’s authorised signatoryWhen every required element is completeSigned warrant and the submission record
Hold and release shipmentQuality, with dispatchUntil the customer’s approval arrives, where requiredApproved PSW on file before the first production dispatch
Keep the recordsQuality document controlFrom approval onwardAn indexed pack per part number and revision

Watch the hand-offs between rows. A common gap is the sub-tier warrant: purchase treats it as a quality document, quality assumes purchase has asked for it, and the request goes out after the run. Writing the owner of each row into the procedure closes that gap on paper, where an auditor will look first.

How does one part move through IATF 16949 product approval?

Take a hypothetical tier-two supplier in Pune that machines a steering-column bracket for a tier-one customer. The bracket starts as a bought-out forging and goes out for zinc plating after machining. The tier-one’s supplier quality manual names the AIAG PPAP manual, asks for a Level 3 submission for new parts and wants the pack uploaded to its supplier portal. The quality head, Meera, is new to this account.

Meera starts with the manual, not the documents. She lists what the customer wants: the PPAP edition, the level, the warrant format, the portal fields and whether shipment must wait for approval. The manual also expects the forging house and the plater to hold their own approvals before her warrant goes out.

Purchase asks the forging house and the plater for their approved warrants while the machining fixtures are still being built. Those approvals sit outside the plant’s control, so they are requested before the run, not after it.

Then comes the run. The bracket is machined on production fixtures at the production site and measured on the gauges named in the control plan, and the capability, MSA and dimensional results come from that run. Only now does drafting start. The ballooned print, process flow, PFMEA and control plan are written to match what happened on the line, and the PSW draft goes to the plant’s signatory.

The lesson in this hypothetical is that the date at risk was never the paperwork. It was the plater’s warrant, a document the supplier does not write and cannot hurry. Asking for sub-tier approvals at the tooling stage is the cheapest schedule protection in the whole pack.

How does PPAP connect to the rest of IATF 16949?

PPAP is the end of a chain the standard builds elsewhere. Planning, risk analysis and control plans feed it, and the PFMEA and control plan in the pack must match the ones used on the line. Our hub on APQP, PFMEA and control plan questions covers those inputs. Changes run the chain again: most customer requirements ask for notification and a fresh submission when the design, process, tooling, location or material source changes.

In practice the documents should agree line by line. The operation numbers in the process flow should appear in the PFMEA and the control plan in the same order. Pick any characteristic on the ballooned print and you should find it in the control plan, with its gauge and reaction plan, and in the dimensional results. When a reviewer can trace one characteristic through every document, the pack describes the process that makes the part.

What product approval mistakes leave a supplier exposed at audit?

Most product approval gaps come from doing the right work in the wrong order or without a written rule. Each mistake below has a fix that belongs in the procedure, not only in the next pack.

MistakeWhy it failsFix
One generic approval procedure that ignores customer manualsThe standard asks for a process that conforms to each customer’s requirementsAdd a route per customer: manual, edition, level, forms and portal
Sub-tier approval requested after your own submissionThe standard requires sub-tier approval before you submitRequest sub-tier warrants when sub-tier tooling is released
Capability and MSA taken from prototype or trial toolingApproval follows verification of the manufacturing processRepeat the studies on production tooling
PFMEA and control plan in the pack differ from the ones on the lineThe pack no longer describes the process that makes the partDraft from the live documents and re-check them before signing
Production shipped while approval is pendingIt breaks the requirement wherever the customer asks for approval before shipmentAdd an approval check to the dispatch release
A process or source change made without telling the customerMost customer requirements ask for notification and resubmissionRoute every change through a form that asks whether it triggers PPAP
Approved packs that cannot be foundKeeping approval records is part of the requirementOne index per part number, with revision and approval date

The useful test for each row is whether your written procedure would have stopped the mistake. A complete pack produced by a procedure that allows the mistake is a pack that worked by luck.

Which questions should a supplier answer before the IATF auditor asks?

Run six yes-or-no questions against your procedure and one recently approved part per customer. Any “no” is a gap to close before the audit.

  1. Does the written procedure name each customer’s approval method, level and portal, or point to where they are recorded?
  2. For the last part approved, can you show sub-tier approvals dated before your own submission?
  3. Did the capability, MSA and dimensional results in that pack come from production tooling?
  4. Do the PFMEA and control plan in the pack match the versions in use on the line today?
  5. Where the customer requires approval before shipment, does a dispatch check block production quantities until that approval is on file?
  6. Can someone outside the quality team find the approved pack by part number and revision?

Score one point for each yes. Six means the procedure and the packs agree. Four or five points to a targeted fix in one or two places. Three or fewer means the procedure needs rewriting before any pack is touched, because the packs are judged against it.

What should a supplier fix in the 30 days before an IATF audit?

Fix the procedure first and a sample of live packs second. Drafting new packs in the last month does not close a gap in the rule that produced the old ones.

  1. Week one: collect the current requirements of every active customer and check that the procedure points to each of them.
  2. Week two: take the most recently approved part for each customer and run the six questions above against it.
  3. Week three: close what the sample found, such as missing sub-tier warrants, an out-of-date PFMEA or control plan, or a missing approval record.
  4. Week four: walk purchase, production and dispatch through their steps in the procedure, and index the approved packs so any one of them can be pulled during the audit.

If the sample turns up the same gap for more than one customer, treat it as a procedure problem and fix the rule once. If it turns up once, fix the pack and note the cause.

How should you brief an outside team to draft PPAP documents?

Hand over the customer’s requirements and the run data, and keep the decisions in the plant. An outside team drafts faster and with fewer rounds when it starts from evidence instead of a blank template.

  1. The customer’s supplier quality manual or customer-specific requirements, with the PPAP edition, level and warrant format.
  2. The drawing at its current revision, plus every specification it calls up.
  3. The process flow as run on the floor, with operation numbers.
  4. The capability, MSA and dimensional results from the production run.
  5. The list of sub-tier parts and the approval status of each.
  6. The portal fields or customer forms the submission must fill.

Keep three things in the plant: the judgement that the part meets requirements, the measurements behind that judgement and the signature on the warrant. The outside team writes; the plant approves. Our page on how automated PPAP documents work explains the drafting side in more detail.

Outside drafting is the wrong call while the process is still moving. If tooling, the routing or the gauges are still changing, any document drafted now will be drafted again, and the time is better spent finishing the run.

What should a quality head decide now?

The decision is who writes the paper, not who owns the approval. The trial run, measurements, capability studies, Gage R&R, lab tests, samples and the signed warrant stay in the plant, because the standard holds the supplier accountable for them. The documents built from that work can be drafted outside. Yamm Labs runs PPAP Desk from Gurugram and drafts the ballooned print, process flow, PFMEA, control plan, MSA formats and PSW draft for Level 3 packs under the AIAG fourth edition.

This is general guidance on a quality standard, not a reading of your contract. Your customer’s supplier quality team decides what it accepts, so check its current requirements before you change the procedure.

People also ask

Which IATF 16949 requirement covers PPAP?

The product approval requirement in the standard’s design and development section. It asks for an approval process that conforms to the customer’s requirements, and the customer-specific requirements of GM and Ford name the AIAG PPAP manual as that process.

Can a supplier be IATF 16949 certified without doing PPAP?

Only if its customers require a different approval method. The standard requires an approval process that matches each customer’s requirements, so an auditor will check the method your customers actually name, and for many automotive customers that is PPAP.

Does IATF 16949 say which PPAP level to submit?

No. The standard sets no level. The customer sets it in its requirements, and Level 3 is the usual default when no other level is named.