Picture a die-casting supplier near Pune sending its first Level 3 PPAP to a Tier-1 customer. The dimensional report is clean, the capability studies look good and the warrant is signed. It comes back in two days. The supplier had ballooned its own redrawn copy of the part, and the redraw carried an older revision letter than the purchase order. Nothing else in the pack was checked. That is how much weight element 1 carries: if the design record is wrong, every measurement built on it describes the wrong part.

The short answer: The Design Record is the released drawing, specifications and CAD data that define the part a supplier sells, and it is element 1 of the AIAG PPAP package. It is owned by whoever holds design responsibility: the customer for a build-to-print part, the supplier for a part the supplier designed. Either way, the supplier works from the current revision, and customers such as Prestolite and Tenneco want every characteristic ballooned and that copy submitted wherever dimensional results are requested.

What counts as the Design Record in a PPAP submission?

The design record is everything that tells a plant what the part must be. Jabil’s PPAP procedure defines it as the part drawing, specifications and electronic CAD data used to convey the information needed to produce the product. In practice that means the released drawing, every specification the drawing calls up, the notes, the material and finish callouts and any referenced standard.

AIAG, the Automotive Industry Action Group that publishes the Production Part Approval Process (PPAP) manual, describes the process as the way to make sure engineering design record and specification requirements are met on parts from a real production run. So element 1 is not paperwork for its own sake. It is the reference point every other element measures against. Dimensional results, material tests, performance tests and the appearance report all exist to prove the part meets what the design record says.

When the drawing arrives electronically, the customer still needs a marked-up copy a checker can read. TI Fluid Systems’ guideline notes that for electronically sent documents this may mean printing a hard copy, adding the reference numbers to it and scanning it back into the PPAP file.

Who owns the Design Record: the customer or the supplier?

Ownership follows design responsibility. The two cases look like this:

  • Build-to-print parts. The customer designed the part, released the drawing and controls its revisions. Jabil’s procedure calls this build to print: parts made to a drawing supplied by Jabil or its customer. The supplier cannot change the record, only request a change.
  • Supplier-designed parts. The supplier is design-responsible, releases its own drawing and owns the design risk. That is why a Design FMEA, element 4, is only required when the supplier designs the part, as Prestolite’s PPAP handbook states.
  • Changes not yet on the drawing. Where a change is approved but not yet released on the record, element 2 carries it. Tenneco and Prestolite both ask for authorised engineering change documents for changes built into the part or tooling but not yet recorded in the design record.

Ownership of the drawing and ownership of the PPAP copy are different things. Even on a build-to-print part, the supplier owns the ballooned copy, the check that it is the current revision, and the link between each balloon and a measurement.

QuestionBuild-to-print partSupplier-designed part
Who releases the drawing?CustomerSupplier
Who can change it?Customer, on request through a change documentSupplier, with customer approval where the customer requires it
Is a Design FMEA needed?NoYes
Who balloons the PPAP copy?Supplier, on the customer’s drawingSupplier, on its own released drawing
What we’ve learned preparing 50+ Level 3 PPAP reports: check the drawing revision against the purchase order before a single balloon goes on. A pack built on the wrong revision has to be rebuilt from the dimensional report onwards, not patched.
The design record is the one document every other PPAP element is measured against, so it has to be the right revision before anything else is built.

What rules do customers set for the ballooned Design Record?

The AIAG manual sets the element, and each customer’s own requirements decide how it must look. These are the decisions that get a pack accepted or sent back, taken from published supplier manuals:

  • Balloon the customer’s drawing, not a redraw. Prestolite prohibits ballooned supplier drawings and treats one as an automatic rejection. TI Fluid Systems will not accept a supplier’s own drawing unless it approved that in advance. Methode tells suppliers to use the drawing it provides and submit the completed drawing as the design record.
  • Balloon everything, not only dimensions. Prestolite asks for every dimension and requirement to be numbered, including drawing notes, electrical requirements, visual features, chemical characteristics and physical properties. Methode lists basic and reference dimensions and geometric dimensioning and tolerancing (GD&T) control frames.
  • Match the balloons to the report. Tenneco requires every balloon number to match the numbers in the dimensional results, and Prestolite requires a ballooned drawing at every submission level where dimensional results are requested.
  • Prove the revision is current. TI Fluid Systems requires the drawing revision to match the purchase order. Tenneco asks suppliers to confirm the latest revision and a production release stamp on the drawing.
  • Attach material reporting where asked. American Axle requires an International Material Data System (IMDS) submission for each PPAP. Methode asks for the IMDS Initial Sample Report as proof that Methode accepted the data.

The practical decision is the order of work. The revision check and the ballooned drawing come first, because the process failure mode and effects analysis (PFMEA), the control plan and the other APQP documents all reference those balloon numbers. Build them on the wrong drawing and they all need rework.

At which PPAP levels is the Design Record submitted?

Under the PPAP retention table, as reproduced in TI Fluid Systems’ guideline, the design record is retained by the supplier at Level 1, submitted at Levels 2 and 3, submitted on request at Level 4 and retained for the review at the supplier’s site at Level 5. TI Fluid Systems sets Level 3 as its default submission, and where a customer does the same, every new part goes in with a ballooned design record. Your customer’s requirements can change the level, so read them before you plan the pack.

What should a supplier do before ballooning the drawing?

Get the current released drawing from the customer in writing, compare its revision with the purchase order and list any open engineering changes. If anything on the drawing is unclear, raise it before submission. TI Fluid Systems asks suppliers to put design record questions to its purchasing team in writing and settle them before the PPAP package goes in.

How do you balloon a design record so every later element lines up?

Balloon the customer’s released drawing at the purchase-order revision, give every requirement on it one number, and carry those numbers unchanged into every document that measures or controls the part. The order below is the one we work in. Each step closes a gap that the supplier manuals quoted above reject packs for.

  1. Confirm the drawing revision against the purchase order, and list any approved changes that are not yet on the drawing so they can go into element 2.
  2. Work on the customer’s own drawing. If it arrived as an electronic file, mark up a copy of that file; do not redraw the part under your own title block.
  3. Number every requirement in the scope your customer’s manual sets. The manuals above reach well past dimensions, into notes, callouts and the specifications the drawing calls up.
  4. Number in a fixed reading order, sheet by sheet and view by view, with the notes last, so a checker can find any balloon without hunting for it.
  5. Build the characteristic list from the balloons: one row per number, with the requirement, its tolerance and the method that will measure it.
  6. Freeze the numbering before the PFMEA and control plan are drafted. If a requirement was missed, give it the next free number at the end; never renumber.

Step six is the one teams skip. Renumbering after the PFMEA is written breaks every cross-reference at once. Because Tenneco requires balloon numbers to match the dimensional results, a renumbered drawing can fail review even when every part measured is in tolerance.

Worked example: what should you do when the drawing and the purchase order disagree?

Ask the buyer in writing which revision governs, and do not balloon until the answer is on file. Take a hypothetical machining supplier near Chennai quoting a build-to-print bracket for a Tier-1 customer. Kavya, its quality engineer, receives the drawing pack by email at revision C. The purchase order, raised earlier, still says revision B, and the plant has already cut first-off parts to B.

Kavya has three tempting shortcuts. She can balloon C because it is newer, balloon B because the order says so, or balloon both and let the customer pick. Each one breaks a published rule somewhere. TI Fluid Systems wants the drawing revision to match the purchase order, and Tenneco wants the latest released revision with a production release stamp. When the newest drawing and the order disagree, the supplier cannot satisfy both on its own.

So she writes to the buyer. The email names both revision letters, lists the characteristics that changed between them, and asks two questions: which revision the PPAP is to be submitted against, and whether the purchase order will be amended to match. That is the step TI’s guideline asks for, with design record questions put to purchasing in writing and settled before the package goes in.

The reply says revision C, with an amended order to follow. Now the cost shows up early, while it is still small. Every characteristic that changed between B and C needs fresh parts measured, and the first-off parts cut to B stay out of the submission. Had ballooning started on B, the dimensional report, the PFMEA references and the control plan would all have pointed at numbers describing a superseded part.

The lesson is easy to miss: the revision check is a conversation with the buyer, and its record belongs in the pack. Kavya files the email thread with the ballooned drawing. When the customer’s quality engineer asks at review why the order and the drawing carry different letters, the answer is already in the file.

Who does what on element 1, and when?

The design owner releases the record, and the supplier owns everything that turns it into PPAP evidence. The split below is for a build-to-print part. On a supplier-designed part, the supplier’s own engineering team also takes the first row.

TaskOwnerWhenOutput
Release the drawing and specificationsDesign-responsible partyBefore the purchase orderReleased drawing at a stated revision
Check the revision against the purchase orderSupplier qualityWhen the drawing pack arrivesWritten confirmation, or a query to purchasing
Raise unclear requirementsSupplier quality or engineeringBefore ballooning startsWritten questions and the customer’s answers
Record approved changes not yet on the drawingSupplier, using the customer’s change documentBefore submissionElement 2 engineering change documents
Balloon the drawingSupplier, or the desk it outsources toOnce the revision is settledBallooned design record and characteristic list
Measure every balloonSupplier plantOn parts from the production runDimensional results keyed to balloon numbers
Sign the warrantPlant’s responsible officialLast, once every element is completeSigned Part Submission Warrant

Two rows decide whether the rest go smoothly: the revision check and the written queries. Both sit with the supplier even when the drawing belongs to the customer, and both must finish before ballooning starts. Name one person for each on the day the drawing arrives.

Which Design Record mistakes get a PPAP sent back, and how do you catch them early?

Element 1 mistakes repeat from part to part, and each one leaves a sign a reviewer can spot before the pack leaves the plant. Use the early-sign column as your final check.

MistakeEarly signFix
A redrawn drawing is balloonedThe ballooned sheet carries the supplier’s title blockBalloon the customer’s drawing, or get written approval for the redraw first
Notes and specifications left unnumberedBalloons stop where the dimensions stopNumber every note, callout and referenced specification
Balloons drift from the reportA report row has no balloon, or a balloon has no rowFreeze the numbering and check one to one before submission
Wrong revisionThe revision letter differs from the purchase orderStop and ask purchasing in writing
Electronic file with no marked copyThe pack holds only the CAD filePrint, mark and scan a copy, as TI’s guideline describes
A change is built in but not documentedParts differ from the drawing and element 2 is emptyAdd the customer’s authorised change document
Material data missingNo IMDS record where the customer asks for oneCheck the customer’s manual and submit before the PPAP

Have someone other than the person who ballooned the drawing run this check. The person who placed the numbers reads what they meant to place; a second reader sees what is on the sheet.

How should you brief an agency or internal team to prepare element 1?

Give the team the inputs that fix the revision and the customer’s rules, and ask for outputs a checker can verify against the drawing. A brief that misses any input below turns into a round of questions later, usually after ballooning has started.

  1. Every sheet of the released drawing, plus each specification and standard it calls up.
  2. The purchase order, showing the drawing revision it was raised against.
  3. Any open engineering change documents or approved deviations for the part.
  4. The customer’s supplier quality or PPAP manual, and the submission level the customer has asked for.
  5. The last PPAP for a similar part from the same customer, if one exists, so numbering habits carry over.

Ask for three things back: the ballooned drawing, a characteristic list keyed to the balloon numbers, and a log of every query raised with the customer and how it was answered. The log is what defends the pack at review.

Keep the division of work clear. Yamm Labs’ PPAP Desk works this way from Gurugram: the desk prepares the ballooned drawing and the documents that hang off it; the plant keeps the measurements, tests and samples, and the plant’s responsible official signs the warrant. The PPAP documentation service page sets out the pilot. For the short answer and the other questions in the series, see the PPAP documentation FAQ.

Outsourcing is the wrong choice in one case. If the part is supplier-designed and the drawing is still changing, the design owner has to release a stable record first. Ballooning a drawing that is still moving buys rework, whoever does it.

People also ask

Is the Design Record the same as the ballooned drawing?

Not quite. The design record is the full set of released drawings, specifications and CAD data; the ballooned drawing is the PPAP copy of it with every characteristic numbered. Customers such as Prestolite and Tenneco require the ballooned version wherever dimensional results are submitted.

Can a supplier redraw the customer’s drawing for PPAP?

Usually not. Several published supplier manuals reject ballooned supplier redraws or accept them only with the customer’s formal approval in advance. Balloon the customer’s released drawing at the revision on the purchase order.

Who fixes an error on the Design Record?

The design owner. On a build-to-print part the supplier raises the issue in writing and waits for the customer’s change or approved deviation. On a supplier-designed part the supplier releases the change and, where the customer requires it, gets approval first.